Projects

Lowestoft Complete Transformation

about the project

A complete Overhall

Project Highlights

The Felbrigg project was efficiently completed in one week, delivering a high-quality driveway that enhances the propertyโ€™s curb appeal. The use of tar and chip, combined with 10mm golden gravel, provides a sturdy and attractive surface, perfect for long-term use.

Completion Time

3 Months

Key features

200 tonne of topsoil, premium turf, full land drain system, Kandler grey sandstone, outdoor kitchen with full electrics, retaining sleeper walls

Cost Of Project

ยฃ60000

"The new driveway looks fantastic! Inspire Landscaping did an excellent job, and the whole process was smooth and professional."

Gallery

Explore The Project

In Felggburgh,ย  We laid a solid sub-base, applied hot tar, and spread 10mm golden gravel. The gravel was compacted into the tar, creating a sturdy, attractive 160 square metre driveway that significantly enhances the property’s curb appeal.